The main activities of MNVAP ”Aircon project”:
- capital construction, repair and reconstruction of residential, industrial and social facilities;
- installation of external power supply networks, 6-10 kV transformer substations;
- installation of internal and external networks (heating networks, heating systems, water supply and sewerage, electricity networks, instrumentation and A);
- installation of boilers, automatic central and individual heating points for heating and hot water supply;
- installation of ventilation and air conditioning systems;
- design and commissioning works of the whole range of construction and installation works;
- fire-fighting works;
- production of switchboard equipment;
- production of elements of ventilation systems;
- trade in electrical, plumbing, heating and ventilation equipment (interregional dealer of companies ”IEK”, ”Schneider electric”, ”WOLF”, ”VIESSMANN”);
- trade in steel ropes.